July 9, 2015

More on the Progress at Canyons!

The lift line that is being made for the new interconnect gondola is in place and tower footings are being dug!

Slowly but surely the new lifts are starting to become something more than just a drawing. You can now see where the lifts will be next winter and imagine taking a short ride from Canyons to PCMR. The largest ski resort in the country.

In the second picture in the attached link you can see something called the Spider Hoe, used for climbing mountains and terrain other equipment cannot reach. Pretty cool piece of equipment. Check out the progress here:

http://www.parkcitymountain.com/site/blog/authors/park-city-mountain-resort/early-july-transformation-updates?cmpid=ET6140288&et_rid=669605606

Back to Blog